|
Tender description :
|
Tenders Are Invited for Building Planning Structural Fire Protection
intention to Award Services:
passau State Building Authority
bima Bpol Deg Kasern Geb 2a-h,k Brandsch
2026_g0_planning Inst Baul Fire Protection
as Part of the “repair of Structural Fire Protection” Measure, There Are at the Site
deggendorf of the Federal Police the Structural Adaptation and Repair of Building 2a
to 2h as Well as K to Ensure Compliance with Building Regulations. the
the Measure Covers All Service Phases of the Hoai.
the Measure is Based on the Existing Fire Protection Certificates and the
associated Test Certificates From the Test Experts Employed. Aim of the
the Measure is the Full Implementation of Those Specified in the Test Certificates
building Regulations Fire Protection Requirements as Well as the Complete Documentation of the
measures Carried Out. After Completion of the Work, the Conformity of the
to Show the Measures Carried Out with the Test Certificates and From the
to Be Certified By the Responsible Testing Expert.
in Total, Around 43,000 M² of Usable Space (nuf) Needs to Be Processed. the Cost Cap
(kog) for the Measure Amounts to €13.179 Million.
the Planning Was Carried Out By Expert and Experienced Structural Planners
fire Protection Must Be Carried Out. They Must Have Proven Experience in the
holistic Planning and Implementation of Fire Protection Concepts for Buildings
building Class 5 with Special Construction Requirements. the Planning and
execution Services Include in Particular:
• Examination and Complete Adoption of the Requirements From These
fire Protection Certificates and Test Certificates; If Necessary, Development
additional Evidence,
• Preparation of the Implementation and Detailed Planning Including Evidence for
fire Compartment Formation, Fire Resistance of Components, Partitions (bulkheads),
escape and Rescue Route-related Measures as Well as Any Necessary Evidence
for Technical Systems (fire Detection, Smoke Extraction, Extinguishing Technology),
• Construction of a Fire Water Pipe Including Installation of a New,
hydraulically Suitable Hydrants at the Location to Ensure the Required
fire Water Supply; This Includes Hydraulic Evidence, Coordination with
the Water Supplier and the Fire Department, Required Connection Permits
as Well as Carrying Out Pressure and Flow Tests,
• Coordination with the Responsible Building Control Authority, the Fire Department and the
testing Experts and Coordination with the User (federal Police),
• Preparation of All Necessary Documents for Acceptance (work and
inventory Plans, Changed Fire Protection Certificates, Test and Acceptance Protocols,
lists of Defects) and Participation in Acceptance By the Inspection Experts,
• Ensuring That the Execution Complies with the Relevant Building Regulations
complies with Regulations and Technical Rules.
estimated Value: 800.000 Eur
|