Tender Detail
Corrigendum - 2 | Published On : 26/04/2024 | |
---|---|---|
Corrigendum Details : |
Deadline has been changes from Apr 25 2024 12:00AM to May 6 2024 12:00AM Date ExteEnsion of t NO 117 |
|
Corrigendum Document : | Can be viewed by Subscribers | |
Corrigendum - 1 | Published On : 19/04/2024 | |
---|---|---|
Corrigendum Details : |
Deadline has been changes from Apr 18 2024 12:00AM to Apr 25 2024 12:00AM Date Extension of t no 117 |
|
Corrigendum Document : | Can be viewed by Subscribers | |
Buyer/Seller : | Can be viewed by Subscribers | |
---|---|
DID : | 71213616 |
Requirement : |
Different Types Of Work Against Summer Plan (Business Plan 2024-25) In The Area Of Kanpur Road Under Jurisdiction Of E.E., Eudd. Safe Loading, Carriage & unloading of Line Material, 11 KV 3x70 sqmm XLPE Cable, Transformer 250 KVA, ABC 3x120 sq.mm, 11 KV Pin Insulator, 11 KV Pin with nut, 11 KV CABLE JOINTING KIT, LT PVC Cable 1x240 Sq. Mm, ST Pole 11 MTR Long. Dragging of ST Pole digging of pit erection of sub-station type double pole structure on ST Pole with fixing of necessary item such as Top Channel, along with grouting Dropper Channel, 11 pin insulator with Pin & 11 KV Disc Insulator with fitting, DO Fuse set its ramming. Cable Hosting of 11 KV 3x70/3x120/3x185/ sq. mm XLPE Cable including jumpering etc complete with help of GI Pipe. Chemical type earthing. Well type earthing of with 60 Fit Deep borring and providing GI Pipe 1.5" dia and earthing must be joint by G.I. Strip of 32x5 mm thick long attached with nut & bolts and GI pipe cap All material and labour. Construction of Transformer plinth, etc. |
Company Industry: | Power Plant |
Key values
Tender Estimated cost : | 1,750,000 |
---|---|
Closing date : | 06/05/2024 |
Location : | India-Uttar Pradesh |