|
Requirement :
|
The work involves the hydro-agricultural development of the Sidi Mohamed Cherif irrigation perimeter associated with the Oualjet Essoltane dam. This includes the construction of the adduction and distribution networks and intra-block equipment. The contractor is responsible for all necessary interventions as required by the tender, including the supply, transport, and installation of irrigation pipes, civil engineering works related to valve chambers and ancillary structures, and the installation of hydromechanical equipment. Irrigation pipes, hydromechanical equipment, valve chambers, adduction and distribution networks, connection fittings, civil engineering for irrigation points
|